Stormdry Masonry Protection Cream - Breathable Water Repellent for Masonry Surfaces

Damp-Proofing Materials: Choose the Right Treatment

A damp patch is a reason to investigate, not a product specification. Before buying damp-proofing materials, establish where the moisture is coming from and which part of the building needs attention. A treatment for rain-soaked brickwork has a different job from an injected damp-proof course or a membrane beneath a floor.

This guide helps you navigate our damp-proofing and building treatments and build a shopping list around the work you actually need.

Start with the source of moisture

Check plumbing, gutters, downpipes, roof junctions, external ground levels and the condition of masonry before choosing a treatment. Condensation, penetrating rain and moisture rising through masonry can need different responses, and more than one cause may be present. A handheld moisture reading alone is not enough to specify a new DPC. If the cause is unclear, arrange a building assessment before purchasing a treatment system.

Which damp-proofing material does which job?

Job Product route Where to start
Reduce rain absorption through suitable exterior masonry Breathable masonry water repellent Stormdry Masonry Protection Cream
Create a remedial DPC after rising damp is confirmed Injection cream or pre-dosed rods Dryzone 310ml cream or Dryrod 10-pack
Install a physical barrier within new masonry Damp-proof course roll TIMCO DPC rolls
Provide a sheet moisture barrier within a specified floor build-up Damp-proof membrane TIMCO Toughsheet DPM
Waterproof a specified masonry or concrete surface Tanking system Toptank tanking slurry
Renew wall finishes following damp treatment Renovation plaster or a specified plasterboard system Dryzone Fast-Set Plaster or Drygrip adhesive

Exterior walls: repair first, then consider protection

A wall coating cannot replace missing pointing, a defective flashing or a leaking gutter. Once defects have been addressed, a suitable masonry cream may be part of a rain-protection plan. Check the substrate and its existing finish: a product intended to penetrate porous masonry needs a suitable exposed surface. Our Stormdry coverage and application guide explains the buying checks for this route.

Rising damp: choose the treatment and the finish together

Where a remedial DPC is specified, compare pack format and application equipment as well as the price on the page. A 600ml foil pack needs different equipment from a small cartridge. Also budget for any work to contaminated or damaged plaster; buying the injection material is only one part of the job.

Read Dryzone cream versus Dryrod rods and our replastering guide before assembling your order.

Floors and below-ground spaces need their own specification

DPC, DPM and tanking are not interchangeable names. A sheet floor membrane needs a plan for joints, edges and connections to the wall barrier. A basement project needs a waterproofing design that deals with the whole space, including junctions and any drainage requirements. Do not assume that adding a coating to one visible patch will address the entire water path.

For the sheet-material options, use our DPC versus DPM guide to compare roll dimensions, membrane thickness and jointing accessories.

Before you order

  • Write down the confirmed problem and the proposed treatment system.
  • Measure wall length, thickness or surface area as appropriate.
  • Check the selected variant, pack quantity and application equipment.
  • Include preparation, jointing and finishing materials from a compatible specification.
  • Check current availability on each product page before arranging the work.

Browse damp-proofing and building treatments to compare the products, then follow the current manufacturer instructions for the exact material supplied.

Technical reference: Safeguard guidance on assessing dampness.

Back to blog

Shop what's in this article

Get the right products for the job

Common questions

Still got questions? Get in touch

Do you offer next-day delivery?

Next-working-day delivery is available on selected stocked items ordered before 3pm Monday–Friday, excluding bank holidays. Supplier exceptions apply, including manufacturer-direct brands taking 5–8 working days. See delivery details and the full brand list.

What is your returns policy?

We accept returns within 30 days on unused, unopened items. Contact us to arrange a return.